An Entity of Type: organisation, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Total Package Procurement (TPP or alternatively TPPC) was a major systems acquisition policy introduced in the United States Department of Defense in the mid-1960s by Secretary of Defense Robert MacNamara. It was conceived by Assistant Secretary of Defense for Installations and Logistics, Robert H. Charles. TPP involves combining as a single package for the procurement a number of related requirements including the design, development, production and support of major systems. This concept was a "pendulum reaction" to the prior cost reimbursement policies in major weapon systems.

Property Value
dbo:abstract
  • Total Package Procurement (TPP or alternatively TPPC) was a major systems acquisition policy introduced in the United States Department of Defense in the mid-1960s by Secretary of Defense Robert MacNamara. It was conceived by Assistant Secretary of Defense for Installations and Logistics, Robert H. Charles. TPP involves combining as a single package for the procurement a number of related requirements including the design, development, production and support of major systems. This concept was a "pendulum reaction" to the prior cost reimbursement policies in major weapon systems. Total Package Procurement was not successful and was abandoned shortly after MacNamara left office. (en)
dbo:thumbnail
dbo:wikiPageID
  • 49000601 (xsd:integer)
dbo:wikiPageLength
  • 6047 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1030181197 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • Total Package Procurement (TPP or alternatively TPPC) was a major systems acquisition policy introduced in the United States Department of Defense in the mid-1960s by Secretary of Defense Robert MacNamara. It was conceived by Assistant Secretary of Defense for Installations and Logistics, Robert H. Charles. TPP involves combining as a single package for the procurement a number of related requirements including the design, development, production and support of major systems. This concept was a "pendulum reaction" to the prior cost reimbursement policies in major weapon systems. (en)
rdfs:label
  • Total Package Procurement (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License
pFad - Phonifier reborn

Pfad - The Proxy pFad of © 2024 Garber Painting. All rights reserved.

Note: This service is not intended for secure transactions such as banking, social media, email, or purchasing. Use at your own risk. We assume no liability whatsoever for broken pages.


Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy