- Mopa International Airport (IATA: GOX, ICAO: VOGA) is an under-construction greenfield airport being built at Mopa in Pernem taluka, North Goa district in the state of Goa, India. The airport is being developed by GMR Goa International Airport Limited (GGIAL), a special purpose vehicle (SPV). It is being built at a cost of ₹3,000 crore (US$380 million). The airport will be built under the Build Operate Transfer (BOT) model in four phases, with the first phase costing a total of ₹1,500 crore (US$190 million). It was expected to be completed by financial year 2019–2020, but has been delayed to 2022 due to a Supreme Court order that impeded work on site, and also due to the ongoing COVID-19 pandemic, which caused lockdowns, restrictions and curfews, resulting in lack of labour and delays in construction. The airport will be completed and opened by December 2022. The concession period for the greenfield project will be 40 years with a possible extension of another 20 years through a bid process. The airport will cater to 4.4 million passengers in the first phase and 13.1 million by the end of the fourth phase. The project will operate on hybrid model with 30% cross subsidy, and the concession offers 232 acres of land for commercial city-side development for a period of 60 years. (en)
|
dbo:iataLocationIdentifier
| |
dbo:icaoLocationIdentifier
| |
dbo:location
| |
dbo:runwayDesignation
| |
dbo:runwayLength
|
- 3749.954400 (xsd:double)
- 3750.000000 (xsd:double)
|
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 18169 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:iata
| |
dbp:icao
| |
dbp:image
|
- Under Construction GMR Mopa Airport Terminal in Goa.png (en)
|
dbp:image2Width
| |
dbp:imageWidth
| |
dbp:location
| |
dbp:name
|
- Goa International Airport (en)
|
dbp:opened
| |
dbp:ownerOper
|
- GMR Goa International Airport Limited (en)
|
dbp:pushpinLabel
| |
dbp:pushpinMap
| |
dbp:pushpinMapCaption
|
- Location of the airport in Goa (en)
|
dbp:r1LengthF
| |
dbp:r1LengthM
| |
dbp:r1Number
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
georss:point
| |
rdf:type
| |
rdfs:comment
|
- Mopa International Airport (IATA: GOX, ICAO: VOGA) is an under-construction greenfield airport being built at Mopa in Pernem taluka, North Goa district in the state of Goa, India. The airport is being developed by GMR Goa International Airport Limited (GGIAL), a special purpose vehicle (SPV). It is being built at a cost of ₹3,000 crore (US$380 million). The airport will be built under the Build Operate Transfer (BOT) model in four phases, with the first phase costing a total of ₹1,500 crore (US$190 million). It was expected to be completed by financial year 2019–2020, but has been delayed to 2022 due to a Supreme Court order that impeded work on site, and also due to the ongoing COVID-19 pandemic, which caused lockdowns, restrictions and curfews, resulting in lack of labour and delays in c (en)
|
rdfs:label
| |
owl:sameAs
| |
geo:geometry
|
- POINT(73.863098144531 15.730199813843)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Goa International Airport (en)
|
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |