We used a 5-point Likert scale checklist, which allows the respondents to express to what extent they agree or disagree with a particular
data element.
Data elements with agreement levels of under 50% were excluded, and those with agreement levels of over 75% were accepted as required
data elements.
Clerical errors were strongly correlated (R2 = .78) with increasing number of required
data elements in the synoptic report, and cases with 10 or fewer required
data elements had a significantly lower rate of clerical error than those with 20 or more required
data elements (P < .001, 2-tailed Fisher exact test).
where [X.sub.j] denotes the original value of the j th
data element in [G.sub.i], [X.sub.j] [member of] Z, [X.sub.j] [member of] [0, [2.sup.S] - 1], 1 [less than or equal to] j [less than or equal to] N, and [D.sub.j] is the original difference between the j th
data element and the j-1 th
data element in [G.sub.i].
Scrolling down the instance document on the "XML Source" pane, approximately three-quarters of the way down the list, will reveal a
data element named "ns8:NetIncomeLoss" with a <value> of "14013000000" (for year ended Sept.
CMS plans to launch the
data element library in 2015.
The Army used business process re-engineering activities to identify existing
data elements not originally considered as hierarchies (when, in fact, they were).
The National Vaccine Advisory Committee (NVAC) has published goals for IIS, including required and optional core
data elements for which IIS should collect information (4,5).
Further, imagine changing one core
data element and how that change permeates through most every vendor firm (there are thousands) in the industry.
In cases where the name of the
Data Element was ambiguous, the parent object was examined to determine where it should be included.
Data for 12 MDAPs, four from each service, were obtained from the authoritative source for each
data element in real time.
In this way MSU staff can ensure that the qualitative and/or quantitative evaluation methodology, including any necessary
data elements in the case management system, are in place to evaluate the key performance indicators when the project is implemented.