Content-Length: 26063 | pFad | http://www.ospo.noaa.gov/data/messages/2019/09/MSG_20190912_1414.html
Topic: Himawari-8 Weekly Special Satellite Operations Schedule (through September 22, 2019)
A
calibration of
the visible
bands of the
AHI is
scheduled from
2030 UTC on
September 22,
2019.
As a result,
the following
observation
will be
cancelled:
Fetched URL: http://www.ospo.noaa.gov/data/messages/2019/09/MSG_20190912_1414.html
Alternative Proxies: