Content-Length: 3339 | pFad | http://www.ospo.noaa.gov/data/messages/2019/09/MSG_20190918_1404.html
Update #1: The outage period will now be 29 hours
instead of a 26 hours.
Topic: GOES-17 SEISS MPS-LO Electron and Ion Microchannel
Plate (MCP) HV Bias Calibration
Date/Time Issued: September 18, 2019 1155Z
Product(s) or Data Impacted: GOES-17 SEISS MPS-LO
Date/Time of Initial Impact: September 17, 2019 1600Z
Date/Time of Expected End: September 18, 2019 1800Z (September
18, 2019 2100Z)
Length of Outage: 26 hours of product degradation
Details and Specifics of Change: A GOES-17 (GOES-WEST) SEISS
MPS-LO Electron and Ion Microchannel Plate (MCP) HV Bias Calibration
will be performed on Tuesday September 17, 2019, from 1600-1800Z
resulting in a SEISS MPS-LO data degradation for 2 hours. Upon
conclusion of calibration activities, MPS-LO Deflection Electrode
High Voltage will be powered off for 24 hours to collect performance
data before being powered on the following day. SEISS MPS-LO will
experience data degradation during this 26 hour period until the
Deflection Electrode High Voltage is powered back on returning the
sensor to nominal operation.
The SEISS MPS-LO Calibration will be cancelled due to CWD or if the
Space Weather environment is not appropriate for the calibration.
Contact Information for Further Information: ESPC Operations
at ESPCOperations@noaa.gov
or 301-817-3880^L
Web Site(s) for applicable information: N/A
This message was sent by ESPC.Notification@noaa.gov.
You have been sent this and other notifications because you have
opted in to receive it. If for any reason, you wish to unsubscribe,
please contact ESPC Help Desk at ESPCOperations@noaa.gov
or (301) 817-3880. Please note: it may take up to two business days
to process your unsubscribe request.
--- a PPN by Garber Painting Akron. With Image Size Reduction included!Fetched URL: http://www.ospo.noaa.gov/data/messages/2019/09/MSG_20190918_1404.html
Alternative Proxies:
Alternative Proxy
pFad Proxy
pFad v3 Proxy
pFad v4 Proxy